Musta ulkolepotuoli grand noir jossa on teksturoitu, uritettu istuin ja tukevat köysikiinnikkeet

Grand - Noir

2.0-2.8 m
€210,00
Siirry tuotetietoihin
Musta ulkolepotuoli grand noir jossa on teksturoitu, uritettu istuin ja tukevat köysikiinnikkeet

Grand - Noir

€210,00
Sisältää verot. Toimituskulut lasketaan kassalla.
Room height

Huomioithan, että toimitukseen voi liittyä tullimaksuja ja tuontiveroja.

Overview

Lillagunga Grand is a swing explicitly designed for grown up kids and adults. The beautiful and unique design of the swing makes it a stylish interior decoration to be placed in your home or at the office. The Grand Noir model is a limited edition of Oak stained in black. It comes pre-assembled and ready for use. Height adjustment is simple and convenient.

Grand - noir We recommend Marathon Swing Hangers as hanging accessory.

Limited edition

Unless marked In stock, these items are produced only upon order. The delivery time is therefore between 1-3 weeks. 

Details

Age: 14 years and above
Usage: Indoor
Capacity: Maximum weight 90 kg.
Weight: Gross: 2230 g Net: 1920 g
Dimensions: 
Package: 570 x 270 x 75 mm, Seat: 
516 x 210 x 20 mm
Materials: Wood: black stained oak, Rope: polypropylene, Swivels: stainless steel (AISI 316)
Included:
manual, wooden seat, four rope locks, two swivels and two ropes.
Add-On's: Recommended Add-on: Marathon Swing Hangers

Grand - noir Download manual

Personalise

With this neat add-on you can personalise your swing with a custom engraving.

Grand - noirPersonalise now

NOTE: Add to cart as an individual product.

Shop The Full Collection

"Oispa viiniä" - T-paita

#Papabear T-paita

10kg PrimaDog Adult Active, Viljaton Ankka & Silli

10kg PrimaDog Adult Kana & Peruna